拱形骨架护坡模具是用于制作拱形护坡的重要工具,它的使用方法很简便,只需要根据客户的需求制作出相应尺寸的拱形护坡模具然后带到施工现场进行现场注浇的生产拱形护坡,一般拱形护坡的直径会在2米到3米之间根据客户指定的尺寸制作出相应尺寸的模具,深度一般会在30-60厘米之间,也是根据客户需求制定,拱形护坡模具是由上拱圈,下拱圈还有两侧的直线段模板组成,首先清点模具的具体数量,使用到的面板数量,螺栓数量,然后运输到施工现场蠕动泵 保定建筑设计 保定网站建设 保定网站制作 保定网络公司 保定办公家具 保定轻钢别墅 进行制作,首先拼接组装模具,使用电动扳手把模具连接处的螺栓固定好,然后检查没有留缝隙之后就要在模具的内壁处刷上一层工业机油,然后注入混凝土使用振动棒把混凝土中出现的气泡全部震动出来,震动大约20分钟左右,因为各地的天气情况不同,所以混凝土凝固的时间也不同,像雨季多的南方凝固时间就会长久一些,北方相对来说凝固时间会短一些,一般3天就可以彻底固,使用模具制作的拱形护坡表面光滑,耐用性强。
Arch skeleton slope protection mold is an important tool for making arch slope protection. Its use method is very simple. Only according to the needs of customers, the corresponding size of arch slope protection die is produced and then brought to the construction site for on-site pouring. Generally, the diameter of arch slope protection will be 2 meters to 3m to make corresponding size mold according to the size specified by the customer, The depth will be generally 30-60 cm, and it is also formulated according to the needs of customers. The arch slope protection mold is composed of upper arch ring, lower arch ring and straight section formwork on both sides. Firstly, the specific number of molds, the number of panels used and the number of bolts are checked, and then transported to the construction site for production. Firstly, the die is assembled, Fix the bolts at the joint of the mould with electric wrench, and then brush a layer of industrial oil on the inner wall of the mould after checking that there is no gap left. Then inject the concrete and use the vibrator to shake all the bubbles in the concrete. The vibration is about 20 minutes left and right. Because the weather conditions are different in different places, the concrete solidification time is different, For example, the southern solidification time will be longer in rainy season, and the solidification time in the north will be shorter than that in the north. Generally, it can be completely fixed in 3 days. The arch slope protection made by mould is smooth and durable.